EXPERIENCE
TOUR PLACE DE LA VICTOIRE- Bucharest 1-7 Iuliu Maniu Bd. Developer: SOCONAC SRL a company of VINCI (France). Designer: Bucharest International Project SA (BIP) General contractor: BATEG (France) Located in downtown Bucharest will be the future headquarters of BRD-Societé Generale with the following characteristics: -total build-up surface = 34 048 m2 -height = 75m -setting in the works: 01.04.2001 -completion the works: 15.03.2003 Specific issue: one of the highest civil buildings in Bucharest; it was the first building in Romania that the contractor was allowed to use “couple-box system” (a system that allows the continuity of reinforcing steel in reinforced concrete elements using a screw nut connection). In order to allow this system that almost halved the execution of the structure, we had to order a technical expertise that pointed out the capacity of the system to absorb the seismic energy. In order that Bucharest is classified as a seismic area, is obvious that such an expertise was a compulsory requirement. Our crew was involved in full time job at all phases of the execution of the project. BANEASA CENTER –Bucharest 17-21 Bucuresti-Ploiesti St. Developers: BSR – (Israel) and IMMOCONSULT (Austria) Designer: Inginerie Civila SRL General contractor: STRABAG (Austria) Office center situate in northern area of the city, that the main tenants are VOLKSBANK, WRIGLEY’S and SCHERING PLOUGH -total build-up surface = 12 250 m2 - height = 37.5m -setting-in the works: 01.04.2000 -completion the works: 15.05.2002 Particularity: Our first project over 10 000 m2 build-up surface. “CENTRE COMERCIAL ORHIDEA”-Bucharest 202 Splaiul Independentei Bd. Developer: VINCI CONSTRUCTION GRAND PROJETS (France). Designer: Bucharest International Project SA (BIP) General contractor: DUMEZ – GTM (France) Hypermarket and commercial gallery located close to the main Bucharest’s rail station. The main tenant: CARREFOUR. Total build-up area: =24 200 m2 Parking: =1 380 pl. Setting-in: 15.08.2002 Completion: 15.09.2003 TV STUDIO WITH INBUILT HOT LIGHT SYSTEM-Romanian Television – 71281 Bucharest, 191 Calea Dorobanti St. Designer: TV International SNC General contractor: TV International SNC Client: Societatea Romana de Televiziune (the national broadcasting company) Total build-up area: =5 304 m2 Setting-in: 01.08.2002 Completion: 01.03.2004 GARRUN IMCO CENTER - Bucharest, 97 Nasaud St. Developer and client: GIRON Ltd. (Israel) Designer: ROMPROIECT S.A. General contractor: SOL MANAGEMENT S.R.L. Total build-up area: =5350 m2 Setting-in: 15.06.2003 Completion: 15.07.2004 “CENTRE COMERCIAL FEERIA”-Bucharest 140A Bucuresti-Ploiesti St. Developer: VINCI CONSTRUCTION GRAND PROJETS (France). Designer: SPA General contractor: DUMEZ – GTM (France) Hypermarket and commercial gallery established in Baneasa Airport area. Clients: HYPROMA (hypermarket “CARREFOUR”); OLYMPIA INVEST (commercial gallery). Total build-up area: =31 500 m2 Parking: =1 560 pl. (approx. 50 000 m2 ) Setting-in: 18.04.2005 Completion: 10.04.2006 “BILLA 1800 BRAILA”-Braila, 1-5 Transilvaniei St. Developer: BILLA INVEST ROMANIA SRL (a BILLA investment and development company). Designer: ARCHIBO CONSULTING SRL General contractor: CONCELEX SRL Destination: Hypermarket Client: BILLA Total build-up area: =3 257 m2 Parking: = 227 pl. (approx. 1 800 m2 ) Setting-in: 01.07.2005 Completion: 14.12.2005 “BILLA 1000 RM. VALCEA”-Ramnicu Valcea, 1 G-ral Magheru St. Developer: BILLA INVEST ROMANIA SRL (a BILLA investment and development company). Designer: CONTEXT DESIGN SRL General contractor: CONCELEX SRL Destination: Hypermarket Client: BILLA Total build-up area: =4 460 m2 Parking: = 95 pl. (approx. 800 m2 ) Setting-in: 01.11.2005 Completion: 16.04.2006 “EUROMALL PITESTI”-Pitesti, Calea Bucuresti St. Developer: SC FLASH CONSULT INVEST SRL Designer: ROMPROIECT General contractor: BOG’ART Destination: Mall. Tenant: EUROMALL. Total build-up area: =32 000 m2 Parking: =720 pl. Setting-in: 05.12.2005 Completion: 31.04.2007